job title:Melbourne/Viera Construction Labor/Pipe Layer/Fore
QR Code Link to This Post
GENERAL FIELD OPERATIONS in the Water and Wastewater Treatment Plant (W/WWTP) construction include:
• Earthwork – Excavation, shoring, trenching, dewatering, backfill, compaction, grading and shooting grade
• Concrete – Forming, rebar installation, pouring, and finishing
• Miscellaneous Metals – Installation of stairs, grating, handrail and other misc. metals
• Treatment Equipment – Installation of water and wastewater treatment equipment/pumps
• Piping – Mechanical joint underground piping, flanged aboveground utility piping and bypass pumping
All Field Personnel can participate in company benefits such as; Personal Time Off (PTO), Florida Blue Health Insurance, and our 401k Retirement Plan.
The current jobsite is located West of I-95 at the N Wickham Rd exit. Our company is growing in the Space Coast and will have lots of work to go around.
Principals only. Recruiters, please don't contact this job poster.